My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SEVENTH
>
15615
>
3500 - Local Oversight Program
>
PR0545683
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 3:18:09 PM
Creation date
5/20/2020 3:06:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545683
PE
3528
FACILITY_ID
FA0005408
FACILITY_NAME
LANGSTON ARCO*
STREET_NUMBER
15615
Direction
E
STREET_NAME
SEVENTH
STREET_TYPE
ST
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
15615 E SEVENTH ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Advanced <br /> GeoEnvironmental, Inc. <br /> 23 March 2006 <br /> AGE-NC Project No. 98-0511 <br /> Mr.Michael Infurna <br /> San Joaquin County Public Health Services-Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,CA 95201 <br /> Subject: Work Status Notification <br /> LANGSTON'S MARKET <br /> 15615 South T° Street,Lathrop,California <br /> Dear Mr. hifurna: <br /> As stated in the Advanced GeoEnvironmental,Inc.(AGE)letter dated 09 February 2006,the AGE-prepared <br /> Additional Site Assessment Work Plan,dated 30 September 2005,could not be completed due to financial <br /> hardship on the part of the client,Mr.James Langston;the additional assessment on Union Pacific Railroad <br /> property could not be completed without additional, non-reimbursable funds required by the railroad to <br /> perform work on its property.However,AGE has proceeded with completion of corrective action plan(CAP) <br /> that will be based on a site conceptual model that is constraint by all available geologic and hydrogeologic <br /> data dating back to 1991.In the site conceptual model,AGE will include arguments for a maximum easter <br /> limit of lateral soil contamination, show trend analyses of declining contaminant concentrations over time <br /> and projected contaminant-level compliance dates,and provide a fate and transport model. <br /> At the present time,most of the modeling work has been completed;however,to better constrain the fate and <br /> transport model,AGE is recommending performance of a slug test at several of the site monitoring wells to <br /> acquire hydraulic conductivity data. Once the additional data has been acquired, AGE anticipates that <br /> completion of the CAP would require an additional one to two weeks to complete determination of remedial <br /> alternatives and writing of the CAP;AGE will submit the CAP before 01 May.2006. <br /> If you have any questions or require further information,please contact our office at(209)467-1006. <br /> Sincerely, ONJOAMMCOLMY <br /> 041ROWMALVOLTHOMMMOW <br /> Advanced GeoEnviro_ 1,Inc 3MEWEINE1lAWTHIRD FLOW <br /> CA4Vtf' } 1 ✓�fCCKfON�f6lOE <br /> * eta;73Lf gpppyM <br /> Calvin F.Lee t1` AppONOW11111M11111111111 M <br /> Senior Project Geologist } <br /> Rem ft r...w.ww .+�■f■ <br /> cc: Mr. James Langston w <br /> ApprOinleAwfto*fAp1*4AbdlownaaddMeM/ <br /> 837 Shaw Road.Stockton,Cal" t�W.I b does ttpt Now P I WIN "I WV 111 @"*r. <br /> Telephone(209)�IG7-.1006 Pas �9�a4`�rl .}S equirements of state Ime or kwal otdirmim. <br />
The URL can be used to link to this page
Your browser does not support the video tag.