Laserfiche WebLink
W71F Environmental Consultants, Ina <br /> Health & Safety Plan for Langston's Market <br /> Page: 3 <br /> 2.0 Safety Implementation <br /> The provisions of the WIdF Environmental Consultants, Inc Health and Safety Plan are <br /> mandatory for all personnel associated with the site project and operations <br /> A complete background review and site visitation will be conducted in order to determine whether <br /> specific amendments are to be made to the Health and Safety Plan based on specific <br /> characteristics which may exist on the job site Any suspected hazards associated with the on-site <br /> operation which exposure to, via inhalation or skin absorption, to such as suspected carcinogens , <br /> or human steriiants, will be documented and specific guidance will be developed and added to th.s <br /> Health and Safety Plan as Appendices <br /> A defined project site layout is paramount to the safe completion of all remedial site <br /> investigations The project site layout has built-in safety features The site is div taec into three <br /> zones The following list defines the required personnel protective equipment <br /> mel Personnel Protective Equipment (PPE) <br /> Personnel who will be working in or aiound the exclusion zone of the job site will use the <br /> following protective equipment and measures as warrant by the Project Manager <br /> • Co%,ei alts as an undergarment <br /> + Saranex outer garment <br /> • Sample gloves (mrer) <br />' • PVC, Nitrile or 7ti7eoprcre otter gloves <br /> • Hard hat <br /> I • Steel toe boots <br /> + Robars or Tingley boots <br /> • Full face piece respirator with R53HE cartridges (a combination of organic vapor, <br /> acid gas, pesticide, radionuclide, high efficiency filter) Note that cartridges should <br /> be changed daily <br /> • All points to be taped <br /> • Self-contained air will be utilized if project dictates <br /> IMore stringent protective equipment requirements will be implemented if necessary This <br /> determination will be made by the project supervisor after review of the materials to be <br /> handled, :he ambient monitoring data, consultation with on-site technical personnel, the <br /> Safety Officer, and the proper management personnel Upgrades in PPE, if necessary, will <br /> be implemented <br />