Laserfiche WebLink
i <br /> FVHF Environmental Consultants, Inc. <br /> Ile Health & Safety Plan for Langston's Market <br /> Page: S <br /> 3.0 Emergency Contingency Plan <br /> IShould any situation or unplanned occurrence require outside or support services, the appropriate <br /> contacts from the following list should be made <br /> • Project Manager <br /> • Client Project Coordinator <br /> • Police/Shenffs Department <br /> • Ambulance <br /> • Hospital <br /> 3.1 Emergency Conditions <br /> In the event an emergency develops on-site, the procedures delineates herein are to be <br /> immediately followed Emergency conditions are considered to exist if <br /> • Any member of the project are is involved in an accident or expenences any <br /> adverse effects of symptoms of exposure while on site <br /> • A condition is discovered that suggests the existence of a situation more hazardous <br /> than anticipated <br /> 3.2 Vinergen y Procedures <br /> In the even of an emergency, the following emergency procedures should be followed <br /> I Personnel on-site should use the "buddy" system (pairs) Buddies should prearrange hand <br /> signals or other mean of communication In emergencies the following hand signals are <br /> suggested <br /> ♦ Hand gripping throat Out of air, can't breathe <br /> ♦ Grip partner's wrist or place both hands around waist Leave area immediately, no <br /> debate <br /> ♦ Hands on top of head Need assistance <br /> ♦ Thumbs up OK, I'm all right, I understand <br /> e Thumbs down No, negative <br /> Site work areas entrance and exit routes will be planned and emergency escape routes <br /> delineated by the Project Manager These routes will be shown to all on-site personnel by <br /> Ithe SSO <br />