Laserfiche WebLink
16475 Tide Rd, Ripon <br /> Page 2 <br /> d. To monitor the effectiveness of the supplemental treatment system, quarterly sampling of <br /> the effluent and under leach field is required. The first sampling shall be done six (6) <br /> months after the OWTS installation. Sampling results shall be submitted to EHD for review. <br /> The EHD may reduce the sampling frequency after one year of sampling. <br /> If you have any questions please contact Naseem Ahmed, Registered Environmental Health <br /> Specialist, REHS, at nahmed@sjgov.org or (209) 468-3436. <br /> Mic el Kith, REHS <br /> Program Coordinator <br /> C: Petralogix Engineering, Inc <br /> Nitrate Well 10/27/15 <br />