Laserfiche WebLink
f <br /> r <br /> 1.0 PURPOSE AND SCOPE <br /> The purpose of this work plan is to outline and describe the methodology to be followed for <br /> drilling and sampling of three soil borings at the SME site on Shaw Road. The proposed scope <br /> of work for this project includes the following tasks: <br /> i <br /> 1. Develop a program work plan and worker health and safety plan for the site assessment <br /> investigation. <br /> 2. Three exploratory soil borings will be drilled and sampled at the site. These soil borings <br /> will be placed to verify the vertical and horizontal extent of petroleum hydrocarbon <br /> contaminated soil at the site related to the former 10,000 gallon UST. It is anticipated <br /> that two of soil borings located outside the former UST excavation will be advanced to <br /> first encountered groundwater. These soil borings will be placed in locations to <br /> supplement existing subsurface information immediately adjacent to the location of the <br /> former UST. The third soil boring will be drilled adjacent to the location of SBI and <br /> within the former UST pit. This soil boring will extend vertically to within five feet of <br /> the first groundwater surface but not extend into the groundwater. <br /> I <br /> The three soil borings will provide infill information to define the horizontal and vertical <br /> extent of the petroleum hydrocarbon soil contamination plume remaining under the <br /> former UST site and to collect groundwater.grab samples to determine if the first water <br /> bearing zone has been impacted by petroleum hydrocarbon contamination. This effort <br /> will also determine if TPH-d concentrations from excavated soil determined to have <br /> elevated TPH-d concentrations in 1,999 have had any attenuation. <br /> Soil samples will be collected at five foot intervals from the borings and screened with a <br /> calibrated field photoionization devices (PID)to determine possible.petroleum <br /> hydrocarbon content. An onsite geologist will log the soil borings and guide the site <br /> i <br /> placement of the soil borings. <br /> Mai\l)\Environmcotal9STElWorkplan%WorkplanI 1192007.wpk 2 <br /> 1 <br /> l <br /> t <br /> I <br /> I <br />