Laserfiche WebLink
1 $ <br /> WORKER HEALTH AND SAFETY PLAN FOR <br /> UNDERGROUND STORAGE TANK SITE INVESTIGATIONS <br /> This document outlines Stephen G. Muir Consulting Geologist&Geophysicist <br /> (Consultant)worker health and safety plan for its employees and contractors to be used at <br /> Merced County UST site investigations. Site-specific information is provided on the cover page <br /> to this document. <br /> This worker health and safety plan was developed by Consultant's industrial hygienist <br /> through consultation of the following documents: <br /> • OSHA 29.CFR 1910- "Hazardous Waste Operations and Emergency Response, <br /> Final Ruling,"Marcia 1989; <br /> • NTOSH/OSHA/USCG/EPA "Occupational-Safety and Health Guidance Manual <br /> for Hazardous Waste Site Activities," October 1985 and, <br /> • Consultant's Health and Safety Program.. <br /> This worker health and safety plan is divided into the following categories: <br /> 1. Job Hazard Assessment; <br /> 2. Exposure Monitoring Plan; <br /> 3. Personal Protective Equipment; <br /> 4. Work Zones and Security Measures; <br /> S. Decontamination and Disposal; <br /> 6. Contractor and Employee Training; and <br /> 7. Emergency Procedures. <br /> I <br /> M ain5DTnvironmemal\\STE\W orkplan%W orkplan I 1 1920 07.wpd <br />