Laserfiche WebLink
_ r _ <br /> Canteen Site Sampling <br /> and Reporting Schedule <br /> Ap <br /> -_ - 1996 <br /> ...--' # 7 �Mtii.7i <br /> S {11 FF t rt r f .„..... ) <br /> MW-8 No Access Monitor, BTEX, MTBE, TPH- BTEX,MTBE, BTEX, MTBE, <br /> (offsite) DO, & ORP; G &DO TPH-G, DO, & ORP TPH-G & DO <br /> _ I <br /> MW-9 No Access Monitor, BTEX, MTBE, TPH- BTEX;MTBE, BTEX; MTBE, <br /> (offsite) DO, & ORP G &DO _ TPH-G, DO, & ORP TPH-G&DO <br /> -- Quarterly _ = Quarterly Report^ Quarterly Report m Quarterly Report <br /> Report _. - <br /> g ' *MTBE sampled during the fourth quarter event only-if the two previous events (second and third) were _ <br /> above detection limits. The May event is dependent upon the installation of oxygen releasing compound <br /> (ORC) being installed in monitor-wells MW-2 and MW-3 during the April event. <br /> A proposal is being prepared for.the installation of two monitor wells down gradient of monitor wells <br /> MW-2 and MW-3 on US Chemical property., for the purpose of'down gradient assessment. <br />_ Sincerely, <br /> Carl E. Wills <br /> - Applied Earth Sciences, Inc. <br /> CEW:dt <br /> . S <br /> -- <br />