My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1500
>
3500 - Local Oversight Program
>
PR0545688
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 11:47:17 AM
Creation date
5/21/2020 9:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545688
PE
3528
FACILITY_ID
FA0003634
FACILITY_NAME
CANTEEN CORPORATION
STREET_NUMBER
1500
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14326008
CURRENT_STATUS
02
SITE_LOCATION
1500 N SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
596
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former Canteen Corporation Facility <br /> 1500 Shaw Road <br /> Stockton, California 95205 <br /> Executive Summary <br /> The Former Canteen Facility is located at 1500 Shaw Road,just east of Highway 99, between <br /> Waterloo Road (Highway 88) and Fremont Street (Highway 26). The one-acre property is zoned <br /> for manufacturing and light industrial use; there are no residences in the immediate area. <br /> According to the San Joaquin County Flood Control District map, no water wells are located '.. <br /> within one=half mile of the site. The site is currently a commercial business. <br /> A petroleum hydrocarbon release'from an underground storage tank, discovered in 1992, <br /> identified a need for assessment and corrective action at the site.Results of the soil and <br /> groundwater sampling conducted;during the assessment portion of the project indicate that the <br /> horizontal extent of the hydrocarbon impact from the underground storage tank (UST) release <br /> has been delineated. Concentrations of hydrocarbons detected in the soil exceeded the <br /> Environmental Protection Agency(EPA) Region 9 Preliminary Remediation Goals (PRGs). <br /> Concentrations of dissolved-phase hydrocarbons in the groundwater exceed the California <br /> Department of Health Services Drinking Water Standard Maximum Contaminant Levels <br /> (CAMCL). <br /> Cleanup Goals <br /> The following cleanup target goals have been set for the site: <br /> • Remediate dissolved-phase contamination to below the drinking water CAMCLs <br /> that have been established by the CA DOH. <br /> • Remediate sorbed-phase soil contamination to below health-based PRG levels. <br /> Estimates of the hydrocarbon mass, removal rates, and remediation time are presented in the <br /> Table below. <br /> ;an,s Estimated <Inthal E R Est mated ;E <br /> NP <br /> {j a R ' 1Vlass � F' ` Rejnoval Rate sRemedaation <br /> cted <br /> "Mediaa�4e �4 .._ lbs ' , � �'TT7 lbslhr <br /> u <br /> Soil (Vadose) 20,479 20.8 0.82 <br /> Groundwater 1,62 0:049 2.78 <br /> Post Corrective Action <br /> Following completion of the corrective action process described above, the remediation <br /> equipment.will be removed from the site. The site will remain a commercial/industrial business. <br />
The URL can be used to link to this page
Your browser does not support the video tag.