My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1500
>
3500 - Local Oversight Program
>
PR0545688
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 11:47:17 AM
Creation date
5/21/2020 9:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545688
PE
3528
FACILITY_ID
FA0003634
FACILITY_NAME
CANTEEN CORPORATION
STREET_NUMBER
1500
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14326008
CURRENT_STATUS
02
SITE_LOCATION
1500 N SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
596
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> r <br /> R Mr. Belthoff y -2- November-14, 2001 <br /> exceed the above pre-approved amounts, the Fund will be unable to expedite your <br /> Reimbursement Request. <br /> e The work products must be acceptable to the County.. <br /> it • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> A <br /> • Although I have referred to th&AES proposal in my pre-approval above, please be aware that <br /> you will be entering into a private contract: the State.of California cannot compel you to sign <br /> - any specific contract. This letter pre-approyes the corrective action related costs as <br /> - �: _.. <br /> presented in the proposal by AES. - <br /> E2 <br /> I also want to.remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary future corrective action <br /> work. If you need assistance in procuring contractor and consultant services,.don't hesitate to <br /> call me. <br /> t <br /> II Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> jp E the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed: Please insure that your consultantprepares their <br /> ' invoices to include the required br.' akdown of costs on a time and materials basis, that <br /> invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> provided for any changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of all: <br /> • subcontractor.invoices, <br /> • technical reports, when available, and <br /> "• applicable correspondence from the County. <br /> Please call if you have any questions; I can be reached at (916) 341-5796. <br /> :Sincerely, <br /> . � ,j <br /> Mark Owens,.Water Resources Control Engineer <br /> Technical-Review Unit <br /> 'Underground Storage Tank Cleanup Fund <br /> Californiv En vironmenta/Protection Agency <br /> ? P.a Kee've%d Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.