Laserfiche WebLink
:E Site:Safety Plan <br /> Leaking <br /> Tank Investigations <br /> 'n <br /> g Petroleum Storage <br /> FORMER CANTEEN FACILITY Project Number. 149-94009-01 <br /> Site: . <br /> Location: 1500 Shaw Rd, Stockton, California <br /> Team Leader: KURT WEBBER Project Manager: JOAN SCHUENEMANN <br /> Plan Prepared By: EMILY J. QUINN Title: Prg. Hydro. I Date: 04/12/99 <br /> Plan Approved By: BRAD ROB Title: SAFETY OFFICER Date: 4(��(pct <br /> E MARK WITH xis <br /> Site Description: Active: Inactive: X <br /> Site History: <br /> Suspected Yes: X No: Unknown: <br /> iRelease: <br /> { <br /> Source of Tank: X Lines: Pump: <br /> Release: <br /> Other: Unknown: <br /> r Suspected Material Released: Gasoline: X Diesel: Waste Oil: Other(specify): <br /> r <br /> Free Product Present: Yes: No:X <br /> Description of tasks likely to be performed: Soil boring installation, soil sampling, water sampling, site assessment <br /> including sample collection. <br /> EMERGENCY INFORMATION <br /> Is 911 available? Yes: X No: <br /> Hospital: St Joseph's Medical Center Phone: (209)333-1289 <br /> Ambulance: Stockton Fire Department Phone: 911 <br /> Police: Stockton Police Phone: 911 <br /> ! Fire: Stockton Fire Department Phone: 911 l <br /> Client Representative: Mr. Bryant Stevens,Compass Group U.S.A. Phone: (704) 329-4172 <br /> r <br /> f' <br />