Laserfiche WebLink
b. Samples will be analyzed for BTEX & TFH_G using EFA Methods <br /> 8020 & 8015M. <br /> 7. All removed spoil will be placed i n properly labeled and <br /> sealed drums & stored on location pending results of laboratory <br /> analyzes. <br /> B. At the completion of operations, all auger-holes will be <br /> grouted from bottom to the surface with a cement/bentonite slurry <br /> under the direction of County EHD personel . <br /> The work will be scheduled after County approval has been <br /> received and arrangements made with the drilling contractor. <br /> William J. Hunter, for <br /> Mo. J. Hunter & Associates <br /> January 12, 1993 <br />