My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010144
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1500
>
3500 - Local Oversight Program
>
PR0545688
>
ARCHIVED REPORTS_XR0010144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 3:19:52 PM
Creation date
5/21/2020 10:06:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010144
RECORD_ID
PR0545688
PE
3528
FACILITY_ID
FA0003634
FACILITY_NAME
CANTEEN CORPORATION
STREET_NUMBER
1500
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14326008
CURRENT_STATUS
02
SITE_LOCATION
1500 N SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former Canteen Facility January 14,2003 <br /> uarterly Groundwater Monitoring Report Pae S <br /> 0 The schedule for groundwater monitoring is as follows <br /> Quarterly Monitoring Annual Monitorm <br /> (All four Quarters) (4t' Quarter) <br /> MW-3, MW-3A, MW-3D, MW-11 All Wells <br /> MW-13, MW-13A, MW-13B <br /> All wells will be gauged quarterly if an analyte is not detected by the laboratory for <br /> two consecutive quarters, then that analyte will only be monitored for during the <br /> annual event AES understands that should a removed analyte be detected in a <br /> monitor well during annual monitoring, quarterly monitoring and analysis will <br /> resume for that well Groundwater monitoring will be performed during the second <br /> month of each quarter and quarterly monitoring reports will be submitted to the <br /> appropriate County and State agencies by the 15°i of the first month following the end <br /> of each quarter <br /> • * A Remedial Action Plan and Remediation System Design submitted in August 2003 <br /> was approved by the San Joaquin County EHD AES subsequently submitted an <br /> Executive Summary to the San Joaquin County EHD for a fourteen-day public <br /> comment period The next step is to submit a well installation permit application, an <br /> Authority to Construct permit and an Authority to Operate permit <br /> If you have any questions or comments, or need additional information, please contact me at <br /> (512) 990-7467, extension 212 <br /> Sincerely, <br /> AES-Regulatory Services, Inc. �Cfi EP, Lft <br /> /i a MUEHL BERGER <br /> y- ,, / • <br /> GCS v, No 525 <br /> Eric W Muehlberger, RG (CA#5255) 'ATS, <br /> Associate Hydrogeologist C <br /> Enclosures Tables,Figures,Appendix A <br /> cc Mr Mike McCreight Mr James Barton <br /> Manager of Real Estate Central Valley Regional <br /> Compass Group USA,Inc Water Quality Control Board <br /> 2400 Yorkmont Rd UST Unit-Annex <br /> Charlotte,NC 28217 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 <br />
The URL can be used to link to this page
Your browser does not support the video tag.