Laserfiche WebLink
i <br /> i <br /> Former Canteen Facility April 4,2002 <br /> Quarterly Groundwater Monitornig Report _ Page 5 <br /> EPA method 8015 modified, and TBA, MTBE, DIPE, ETBE, TAME, 1,2-DCA, and <br /> EDB by EPA method 8260B <br /> • The proposed schedule for groundwater monitoring is as follows <br /> Quarterly Monrtorm Annual Momtonng <br /> MW-3, MW-3A, MW-3D, MW-11 MW-1, MW-2, MW-4, MW-5, <br /> IMW-13, MW-13A, MW-13B MW-6,MW-7, MW-8, MW-9, <br /> MW-10, MW-12 <br /> All wells will be gauged quarterly Groundwater monitoring will be performed <br /> during the second month of each quarter and quarterly monitoring reports will be <br /> submitted to the appropriate state agencies by the 15'h of the first month following the <br /> end of each quarter <br /> If you have any questions or comments, or need additional information, please contact me at <br /> (512) 990-7467, extension 212 <br /> Sincerely, <br /> AES-Regulatory Services, Inc. <br /> ERIC �N <br /> MUEHLBERGER <br /> w <br /> rEric W Muehlberger, RG (CA#5255) N� No 5 $5 <br /> Associate Hydrogeologist F(�F 1.\ <br /> Enclosures Tables <br /> Figures <br /> Appendix A <br /> cc Mr Richard Belthoff Mr Marty Hartzell <br /> Director of Real Estate Central Valley Regional <br /> Compass Group USA, Inc Water Quality Control Board <br /> 2400 Yorkmont Rd UST Unit- Annex <br /> I Charlotte, NC 28217 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 <br /> ISICU(,,, <br /> 0 <br /> L�C£5~ <br />