Laserfiche WebLink
DEL-TECH Geotechnical 5uplx)rtSemce5 <br /> MONITORING WELL FIELD LOG <br /> 1996 <br /> PROJECT NAME SAMPLE ANALYSIS PERFORMED TPH-Gas, B T X E , <br /> CANTEEN MTBE <br /> 1500 SHAW ROAD SAMPLE TIME: 13 56 <br /> STOCKTON, CA SAMPLE CONTAINER(S)- HCL PRESERVED <br /> V O A's& 1 BAILER BLANK <br /> CONTAINERS SUPPLIED BY LABORATORY <br /> ANALYSIS PERFORMED BY- SHERWOOD LABS <br /> CLIENT.AES/HUNTER&ASSOIATES DATE: 07/25/1996 <br />' PROJECT MANAGER CARL 1 BILL SAMPLE LOCATION MW-1 <br /> AMPLER DON LIGHT START TIME <br /> GROUNDWATER: XXX ADOSE OTHER WELL HEAD P I D READING 0 0 PPM <br /> CASING ELEVATION FEET MSLCASING DIAMETER 4 INCH <br />' DEPTH TO WATER 56 84 FEET CALCULATED CASING VOLUME 15 11 GAL <br /> DEPTH OF WELL 80 00 FEET TOTAL VOLUME PURGED 45 0 GAL <br /> TIME VOLUME pH E.C. TEMP. O.R.P COLOR D.O <br /> gallons units Umhoslcm Degrees C (Mvolts) (Visua[ PPM <br /> 0 71 518 208 047 LT TURBID/ 8 <br /> NO ODOR <br />' <br /> 150 71 544 198 031 CLEAR 2 <br /> 300 72 554 197 023 2 <br /> 450 72 541 198 021 2 <br />' PURGE METHOD2 R G" UNDFOS SUBMERSIBLE PUMP <br />' SAMPLE METHOD 1' STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE: DEPTH TO WATER AT SAMPLE TIME 56 88' <br /> WELL INTEGRITY CAP AND SEAL ARE SECURE, LOCK INSTALLED <br /> REMARKS GOOD RECHARGE <br /> WEATHER CLEAR SKIES <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER &ALCONOX <br />' NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION SEE SITE MAP <br /> CONTAINMENT POLY DRUMS <br /> INSTRUMENTATION. ORION pHITEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br /> ORION CONDUCTIVITY METER <br /> YSI 3560 FLOWCELL CHAMBER 1 D O METER <br /> SOLINIST SLOPE METER 1 KECK PRODUCT INTERFACE METER <br /> THERMODYNE 5806 PHOTO IONIZATION DETECTOR <br />