Laserfiche WebLink
DEL-TECH Geotechtucal Support4ernice5 <br /> MONITORING WELL FIELD LOG <br /> 1996 <br /> PROJECT NAME SAMPLE ANALYSIS PERFORMED TPH-Gas, B T X E , <br /> CANTEEN MTBE <br />' 1500 SHAW ROAD SAMPLE TIME 15 46 <br /> STOCKTOK CA SAMPLE CONTAINERS): HCL PRESERVED <br /> V O A's& 1 BAILER BLANK <br /> CONTAINERS SUPPLIED BY LABORATORY <br /> ANALYSIS PERFORMED BY SHERWOOD LABS <br /> CLIENT AES 1 HUNTER&ASSOIATES DATE: 07/25/1996 <br />' PROJECT MANAGER CARL/BILL SAMPLE LOCATION. MW-11 <br /> SAMPLER' DON LIGHT START TIME <br />' GROUNDWATER: XXX—]�ADOSE OTHER WELL HEAD P I D READING 0 0 PPM <br /> CASING ELEVATION FEET MSLCASING DIAMETER: 2 INCH <br />' DEPTH TO WATER 56 21 FEET CALCULATED CASING VOLUME- 2 25 GAL <br /> DEPTH OF WELL 70 04 FEET TOTAL VOLUME PURGED 10 0 GAL <br /> TIME VOLUME pH E.C. TEMP O.R.P. COLOR DO <br /> gallons units Umhos/cm Degrees C Mvolts Visual PPM <br />' 0 71 1211 210 11 LT TURBID 2 <br /> 25 71 1212 211 11 NO ODOR 2 <br />' 50 71 1213 211 11 u 2 <br /> 75 71 1213 210 12 2 <br />' 100 71 1218 210 11 2 <br />' PURGE METHOD . 2"GRUNDFOS SUBMERSIBLE PUMP <br /> SAMPLE METHOD 1'STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE, DEPTH TO WATER AT SAMPLE TIME 57 10' <br />' WELL INTEGRITY CAP AND SEAL ARE SECURE, LOCK INSTALLED <br /> REMARKS- GOOD RECHARGE <br /> WEATHER CLEAR SKIES <br /> QUALITY CONTROL- ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER &ALCONOX <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION SEE SITE MAP <br /> CONTAINMENT POLY DRUMS <br /> INSTRUMENTATION ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br /> ORION CONDUCTIVITY METER <br /> YSI 3560 FLOWCELL CHAMBER 1 D O METER <br /> SOLINIST SLOPE METER/KECK PRODUCT INTERFACE METER <br /> THERMODYNE 5806 PHOTO IONIZATION DETECTOR <br />