Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> PROJECT NAME Canteen Corp SAMPLE ANALYSIS PERFORMED TPH-Gas, B T X E <br /> 1500 Shaw Road SAMPLE TIME., 18 32 <br /> Stockton, CA SAMPLE CONTAINER(S) PROVIDED BY LAB <br /> 3VOA's <br /> LAB ANALYSIS COMPLETED BY SHERWOOD <br /> CLIENT APPLIED EARTH SCIENCES DATE 12/19/95 <br /> PROJECT MANAGER- LISA EMMET SAMPLE LOCATION MW- 3 <br /> AMPLER DON LIGHT START TIME. <br /> GROUNDWATER XXX J�ADOSE OTHER. P I D WELL HEAD READING 0 0 PPM <br /> CASING ELEVATION FEET MSLCASING DIAMETER 4 INCH <br /> DEPTH TO WATER 55 39 FEET 12ALCULATED CASING VOLUME 16 06 GAL <br /> DEPTH OF WELL 85 00 FEET ITOTAL VOLUME PURGED 49 5 GAL <br /> TIME VOLUME pH E.C. umhoslem TEMP COLOR OTHER <br /> . gallons units De gees C Visual - <br /> 0 66 1083 187 TURBID GAS ODOR <br /> 165 66 1034 193 " <br /> 330 66 1008 193 "495 66 996 193 <br /> PURGE METHOD 4" GRUNDFOS PUMP <br /> SAMPLE METHOD. 1 FOOT STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE 55 42' DEPTH TO WATER AT SAMPLE TIME <br /> WELL INTEGRITY CAP AND SEAL ARE SECURE, LOCK IS INSTALLED <br /> REMARKS GOOD RECHARGE <br /> WEATHER OVERCAST SKIES <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER&ALCONOX <br /> GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION SEE SITE MAP <br /> CONTAINMENT POLY DRUMS <br /> INSTRUMENTATION ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />