Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> i <br /> PROJECT NAME: Canteen Ggrp� SAMPtZ ANALYSIS PERFORMED :TPH-Gas, E T.X.E i <br /> 1 SW Shag Road AMPLE TIME. 1610 <br /> Stockton,CAAMPLE-CONTAINER(ft PROVIDED BY LAS <br /> 3 V Q&'s <br /> LAB, ANALYSIS COMPLETED BY- SHERWOOD <br /> CLIENT HUNTER & ASSOCIATES DATE 08/01/94 <br /> PROJECT MANAGER BILL HUNTER SAMPLE LOCATION MW-4 <br /> I <br /> AMPLER DON LIGHT START TIME <br /> GROUNDWATER- XXX ADOSE OTHER P I D WELL HEAD READING 100 PPM <br /> CASING ELEVATION {FEET MSL} ASING DIAMETER 4 INCH <br /> DEPTH TO WATER 65 75 FEET CALCULATED PURGE VOLUME 9 3 GAL <br /> DEPTH OF WELL 80 00 FEET ACTUAL VOLUME PER PURGE 9 0 GAL <br /> TIIiII.E VOLUME pH E.4, Tom COLOR OTHER <br /> . gallons Tits n r mbaskm Degmes C (VIsua1) <br /> 0 70 640 260 LT TURBID GAS ODOR <br /> 90 70 580 222 " " <br /> 180 71 630 221 CLEAR " <br /> 270 71 652 217 " <br /> 360 7 1 648 215 " <br /> PURGE METHOD GRUNDFOS 2" STAINLESS STEEL SUBMERSIBLE PUMP <br /> SAMPLE METHOD 1 FOOT STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE DEPTH TO WATER AT SAMPLE TIME <br /> WELL INTEGRITY CAP AND SEAL ARE SECURE, NO LOCK INSTALLED <br /> REMARKS GOOD RECHARGE <br /> WEATHER. CLEAR SKIES AND HOT <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER & ALCONOX <br /> GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION WELL IS LOCATED AT THE NORTH CENTER AREA OF BACK LOT NEXT TO <br /> BUILDING <br /> CONTAINMENT DO T 17 DRUMS <br /> INSTRUMENTATION ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br />. ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580E PHOTO IONIZATION DETECTOR <br />