My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010336 (2)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1500
>
3500 - Local Oversight Program
>
PR0545688
>
ARCHIVED REPORTS_XR0010336 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 11:23:19 AM
Creation date
5/21/2020 10:29:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010336
RECORD_ID
PR0545688
PE
3528
FACILITY_ID
FA0003634
FACILITY_NAME
CANTEEN CORPORATION
STREET_NUMBER
1500
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14326008
CURRENT_STATUS
02
SITE_LOCATION
1500 N SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. CALCULATION SHEET H-1 <br /> SITE CALCULATIONS — HYDROCARBON MASS & CLEAN-UP TIME <br /> Former Canteen Facility <br /> 1500 Shaw Road <br /> Stockton, California <br /> CONTAMINANT REMOVAL/RECOVERY DATA' <br /> Flow Rate Concentrations Removal Rate <br /> Phase (sr-fm), (gpm) (mg1L) (lbs/hr) <br /> Sorbed-Phase 1 Vapor 200 h' 2773 208 <br /> Groundwater 210 180 2• 0 049 <br /> LNAPL -- NA �- <br /> Special Notes f`l <br /> 1 The SVE flow rate is estimated from 5 wells operating at 40 scfm each <br /> 2 The groundwater concentration is the average(geometric mean)** <br /> VADOSE ZONE HYDROCARBON RECOVERY <br /> Total Vadose Zone Hydrocarbon Mass 20,079 pounds <br /> • Total Soil Volume 251,373 ft <br /> Time Required for One (1) Pore Volume 838 hours <br /> Estimated Time for Vapor Removal 082 years <br /> DISSOLVED-PHASE HYDROCARBON RECOVERY <br /> Total Water-Bearing Zone Hydrocarbon Mass 1616 pounds <br /> Total Soil Volume 50,275 ft <br /> Time Required for One (1) Pore Volume 119 hours <br /> 497 days <br /> Estimated Time for GW Mass Recovery 2.78 years <br /> NOTES <br /> 1 Input concentrations in mg/kg for soil and mg/L for groundwater and vapor <br /> 2 Input vapor flow rate in scfm for soil-vapor and gpm for groundwater and LNAPL <br /> 3 The average SVE remediation rate was estimated to be 15% of the initial removal rate <br /> 4 The average AS remediation rate was estimated to be 15% of the initial removal rate <br /> 5 The concentrations in soil and groundwater were estimated from the BTEX or TPH concentrations <br /> 6 Data in shaded fields is calculated <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.