Laserfiche WebLink
Received 6/23/03 15 41 , 2813437721 -- APPLIED EARTH SCIENCES, Page 4 <br /> Jun 23 03 03: 33p PRM Gulf Coast 2613437721 P• 4 <br /> ESTIMATE <br /> FCAT <br /> ta X TX03-2028 1)e• 4/1'1/2003 0ALYTIC OXIDIZER <br /> ► 300 SCFM rated electric oxidizer MANA GtMtN T fl <br /> ► Oxidizer is designed to operate at 25% LEL maximum <br /> ► 70% pre-heat exchanger, Stainless Steel shell and tube <br /> ► Complete air process system to be T304 Stainless Steel <br /> Enardo series 7 flame arrestor <br /> Be- Cold side and hot side manual bypass valves on heat exchanger <br /> W Drlubon air and process flow switches for system protection <br /> ► Auto dilution vahre and flame arrestor <br /> ► 1 HP, 7EXP dilution and purge blower <br /> ► Love Temperature controls <br /> ► Exhaust stack with rain cap and sample port <br /> ► PLC Control System <br /> ► Auto Restart <br /> ► (1)catalyst(-98% efficiency),optional 2nd cat for>99%destruction <br /> ► Pre and post catalyst temperature sensors <br /> ► (2) temperature controllers to keep the oxidizer at proper operating temperature <br /> ► NEMA 3R control panel to operate the oxidizer,23OV, 3 phase system <br /> ► Control panel mounted and wired to the oxidizer with auxiliary Contacts <br /> for existing control paned,with breakers and panel dead frvrd <br /> ► Mounted on a panted carbon steel skid <br /> ► Please see electrical fuel usage calculations for worse Case(low cost to operate) <br /> • REMEDIAL EQUIPMENT $27,12T.63 <br /> OXIDIZER $34,640.50 <br /> DF-LIVERY $4,900.00 All equipment <br /> TAX $0.00 <br /> Start up Training 1 Day Mandatory on Oxidizer $1,50000 <br /> TOTAL SYSTEM PRICE $68,161813 <br /> Note that the above shipping is for private carrier hot shot, this is worse case scenario price can be <br /> lowered with use of common truck mixed load <br /> DELIVERY Sparge Skid or SVE Sidd Only $ 600 00 each <br /> DELIVERY Sparge Skid and SVE skid $ 975 00 common tamer <br /> DELIVERY all not dedicated truck $ 3.10000 <br /> Lead Urns is determined at tame of order, but is typically 10-14 weeks from receipt of <br /> approved submittals <br /> OPTIONS <br /> OPTION i Telemetric Wireless Telemetry unit to measure pre cat temperature, post cat <br /> temperature, and oxidizer total flow Web enhanced software included <br /> Add$1900 00 $35 00 month seance <br /> OPTION 2 Provide 2 Separate Panels for SVE and Sparge mounted and wired <br /> Add$2590 00 <br /> OPTION 3 Single Skid 4'x 5'for Control Panel, SVE, and Sparge Units <br /> add $400 00 <br /> • <br /> Please check and initial d o bons are requested "Xw out rf o dons are declined <br /> TX03-2028 Canteen Facility Sparge Vent <br /> www pmr-net com <br /> 6/23/2003 Page 3 <br />