AS-I through AS-13, and five (5) SVE wells, designated VE-1 through VE-5 The wells will be <br /> ialigned in a row extending downgradient from the former UST tankfield to the MW-3 monitoring <br /> well cluster near the site property line The remediation system layout for the project site is <br /> presented on Figure 9 <br /> Aar Sparging Wells and Associated Plumbing <br /> Pilot testing well IAS-1 will be re-designated AS-1 and utilized as part of the remediation system <br /> An additional 12 AS wells (AS-2 through AS-13) will be installed to a depth of approximately <br /> 60 feet bgs This well depth was selected based on the results of the pilot testing and may be <br /> adjusted during the installation activities based on hydrogeologic conditions The primary concern <br /> is that the depth of the AS wells is 5 to 10 feet below encountered groundwater The additional 2- <br /> inch PVC AS wells will be constructed utilizing 5 feet of 0 010-inch circum-slotted well screen and <br /> approximately 55 feet of blank PVC riser The annulus of each AS well will be backfilled with <br /> 20/40 silica sand to approximately 54 feet bgs (1 foot above the screened interval) The sand pack <br /> will be topped with a 2-foot bentonite seal and then capped with approximately 50 feet of <br /> bentonite/cement grout, culminating approximately 2 feet bgs Each AS well will be accessed by <br /> an 18-in x 18-in steel manway which will be set in a 3-ft x 3-ft concrete pad A gate valve and <br /> . pressure gauge will be installed at each manway for the control and confirmation of air delivery and <br /> pressure <br /> The AS wells will be piped in groups of two to a distribution header for compressed air delivery <br /> The only exception will be well AS-7 which will have a separate air delivery line The air delivery <br /> lines will be constructed utilizing 3/4-inch steel piping The air delivery manifold will include control <br /> valves, in-line rotometers, and pressure gauges to assist in quantifying the operating parameters for <br /> the AS wells <br /> Soil Vapor Extraction Wells and Associated Plumbing <br /> Pilot testing wells VE-1 and VE-2 will be utilized as part of the remediation system An additional <br /> three (3) SVE wells (VE-3 through VE-5)will be installed to a depth of approximately 40 feet bgs <br /> This well depth was selected based on the results of the pilot testing and may be adjusted during the <br /> installation activities based on geologic conditions at the various locations The primary concern <br /> will be to maintain the depth of the SVE wells above the current groundwater levels The additional <br /> 2-inch SVE wells will be constructed utilizing 30 feet of 0 010-inch circumslotted well screen and <br /> approximately 10 feet of blank PVC riser The annulus of each SVE well will be backfilled with <br /> 20/40 silica sand to approximately 9 feet bgs (1 foot above the screened interval) The sand pack <br /> • will be topped with a I-foot bentonite seal and then capped with approximately 6 feet of <br /> bentonite/cement grout, culminating approximately 2 feet bgs Each SVE well will be accessed by <br /> an 18-in x 18-in steel manway which will be set in a 3-ft x 3-ft concrete pad A gate valve and <br /> V-2 <br />