Laserfiche WebLink
COST TABLE II <br /> REMEDIATION EQUIPMENT AND SYSTEM INSTALLATION COSTS <br /> Former Canteen Facility <br /> 1500 Shaw Road <br /> Stockton, California <br /> Waste Management Costs Qty. Units Unit Cost Item Costs <br /> Load and Haul Excavated Soils and Asphalt 130 cu yds $ 4200 $ 5,460 <br /> Dispose of Excavated Sods and Asphalt 130 cu yds 3000 3,900 <br /> Waste Mgmt Mark-Up— Cost+10% 1 ILS 936936 <br /> Subtotal $ 10,296 <br /> Laboratory Costs Qty JUnits I Unit Cost Item Costs <br /> BTEXITPH —Soil Stockpile 3 smpl $ 110 $ 330 <br /> TCLP Lead--Sod Stockpile 1 smpl 125 125 <br /> RCI —Soil Stockpile 1 smpl 150 150 <br /> BTEX/TPH — EPA 8021 (Water Start-Up) 4 smpls 110 440 <br /> Special Parameters (Water Start-Up) 1 sample 500 500 <br /> Laboratory Mark-Up— Cost + 10% J 1 1 LS 1 155 155 <br /> Subtotal $ 9,545 <br /> pplied Earth Sciences— Coordination Supervision Qty Units Unit Cost Item Costs <br /> Sr Engineer/Geologist— Office Coordination & On-Site Supervisio 100 hrs $ 85 $ 8,500 <br /> On-Site Construction Supervisor 150 hrs 65 9,750 <br /> Estimated Time On Site 2 to 3 weeks Subtotal $ 78,250 <br /> Travel Costs Qty. Units Unit Cost Item Costs <br /> Per Diem (Lodging & Food) 25 days $ 100 $ 2,500 <br /> Airfare (Two Way) 4 LS 550 2,200 <br /> Vehicle Rental 5 weeks 250 1,250 <br /> Senior Engineer (16 hrs/trip) 48 hrs 85 4,080 <br /> On-Site Supervisor(16 hrs/trip) 16 hrs. 65 1,040 <br /> Miscellaneous (Shipping, Special Items, etc ) 1 LS 500 500 <br /> Travel Costs Mark-Up—Cost+ 10% 1 LS 1,157 1,157 <br /> Subtotal $ 92,727 <br /> AES Installation Report & Engineering Drawings Qty Units Unit Cost Item Costs <br /> Sr Engineer/Geologist 40 hrs $ 80 $ 3,200 <br /> Project Hydrogeologtst/Scienttst 15 hrs 75 1,125 <br /> Drafting 35 hrs 45 1,575 <br /> Miscellaneous (Color Copies, Photos, etc) 1 ea 1,950 1,950 <br /> Subtotal $ 7,850 <br /> ESTIMATED TOTAL $949,35 <br /> G IDocslCompass1940091TabJcslRAP Costs(07-07-03)xis <br /> Installation -Page 3 Applied Earth Sciences <br />