Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) <br /> XVI. LINE LEAK DETECTOR TESTING <br /> f Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? r r <br /> (Check a//that apply.) Simulated leak rate verified: W 3 GPH r 1.1 GPH r 0.2 GPH <br /> Was the testing apparatus properly calibrated? r r 1- <br /> For <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? r r r <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected? r r r <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? r r I, <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? r r 17 <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? r r r <br /> Were all items on the equipment manufacturer's maintenance checklist completed? Iy—, r r <br /> Were all LLDs confirmed operational within regulatory requirements? F71 I r r <br /> For any answer of"N"above, describe in section X111 how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM/PRESSURE/HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> 7 Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) 171 Vacuum r- Pressure r Hydrostatic <br /> Sensor ID Component(s) Monitored by this Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> S9 RUL PROD VAC I✓ Pass r Fail I-7-Pass r Fail <br /> S10 RUL STP-FILL VAC IV Pass r Fail rv-Pass r Fail <br /> S11 RUL VAPOR LN UDC r Pass r Fail r Pass r Fail <br /> S12 PUL PROD VAC r Pass r Fail I✓ Pass r Fail <br /> S13 PUL STP-FILL SUMPS r Pass r Fail r Pass r Fail <br /> S14 PUL-RUL VENT LINE r Pass r Fail r Pass r Fail <br /> S15 DIE PROD VAC r Pass r Fail r Pass r Fail <br /> S16 DIE STP-FILL SUMPS rv-1 Pass r Fail r Pass r Fail <br /> S17 DIE VENT LINES W Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> How was interstitial communication verified? C✓ Simulated leak at far ends of the interstitial space. r Visual Inspection <br /> r Other Describe the method in section XV below. r Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? r Yes r No (Describe the reason in section XV below.) <br /> For any answer of"N"above, describe in section Xlll how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH =Gallons per hour, Y=Yes, N = No, NA= Not applicable, VPH =Vacuum/Pressure/Hydrostatic, ID=Identification <br />