My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2021 1:26:49 PM
Creation date
5/21/2020 12:39:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
€y <br /> Mir <br /> PEIIRP1200-17 <br /> �± <br /> #. 1 Termination fittings must be sealed u all piping <br /> 5. PIPING SECONDARY terminations, and test fittings must be accessible to �- <br /> CONTAINMENT INTEGRITYp rf�rrr� the test. <br /> TESTING Check with the piping manufacturer regarding �} <br /> testing procedures and the proper pressure before <br /> 6.1 General. Underground product pipiug is available testing. Testing requirements Stated it7 this recom- <br /> with single and double walls. Double-walled piping pro- mended practice are general statements and may a 3 <br /> vides containment for leaks from primary containment Y�Y Recommended pressure levels and test data- a <br /> and must be leak-free to prevent release of product into rionC are a6dressed in Section 5.3.5. Piping mann- w <br /> the environment. facturers' test procedures may differ. <br /> 5.2 Purpose. This rnetllod is used to test the integrity This test cart be conducted in seetir�ns or as one € <br /> continuous pipe depending on the insLal Iation.Care <br /> of piping interstitial space(s). <br /> should he taken to ensure that the entire secondary � <br /> 5.3 Testing Piping Under Pressure. containment of the piping system is tested. <br /> 5.3.1 Description of Test. The interstitial space 5.3.4 Test Equipment. Test equipment shall <br /> is sealed at the ends and is pressurized with an inert include: 5 <br /> gas. The pressure is monitored for 1 hour. If any inert gas scurce (nitrogen, helium, etc,); 5 <br /> pressure drop occurs, the secondary containment <br /> fails the test. stopwatch or other time-rneasum meat devise <br /> capable of measuring a 1-second increment; <br /> 5.3.2 Test Conditions. The primary, pipe may R <br /> contain fuel, and dispensing 9 []cities may Con- test tubing assetablies (Tubing assernblLes pia- S <br /> tinue during the test without affecting test results. vide access to the beginning and end of the <br /> interstitia] space,); <br /> 5.3.3 Preparation. If the interstitial space con- pressure gauge with a 15 prig maximum pres- <br /> tains product, ensure that the interstice is open to sure reading with 0.5 increments. <br /> the atmosphere and perforin a precision test on the <br /> primary piping before cunducOng a test an the sec- 53.5 Test Procedure. <br /> ondary cowair rrw piping, 1..If necessary, re-install termination (test)boots at <br /> piping terminations, <br /> 2,If necessary, connect the tubing assemblies to <br /> ' A the secondary containment termination fitting <br /> �i. <br /> on each end of the section of piping to be tested. <br /> 3.Connect the inert gas source and pressure gauge. <br /> - 4. Gradually pressurize the interstitial space to 5 <br /> prig_ Close rhe valve and allow the pressure to <br /> stabilize. Repressnrize to the specifted test pres- <br /> sure if necessary, <br /> S.Observe the pressure for a period of 1 hour. <br /> " G. If the piping pressure after 1 hour is less than the <br /> test pressure,check termination Fittings and test <br /> . assemblies for leaks. <br /> T.Release the pressure on the system slowly. <br /> S.Remove the test equipment. <br /> FIGURE 54., 80013 on piping rransitlorrs and through g.Restore the piping to its normal operating candi- <br /> surnp walls must be teak-tight when plpp rrg secordary tion. <br /> con toOment Otegrrty testing is pertormea. <br /> 0 peLarg <br />
The URL can be used to link to this page
Your browser does not support the video tag.