My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2021 1:26:49 PM
Creation date
5/21/2020 12:39:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: 6425 N. Pacific Ave., Stockton <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . .Reg.STP . . . . . . . . . . . . . . . . . <br /> ATG <br /> . . . . . 460 280 TLS . ESESO. <br /> ' ESO <br /> . . . . .8484. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> t/. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . Reg . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 208 .0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . 12 268. . .11 . . . . . . . . . . . . . . . . . . . 2 •208. . 1. . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . DSL.0 . <br /> . . . . . .208. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> VENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . SUMP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . DSL STI' <br /> 208. . 460.280 . . <br /> .ATG. <br /> . . . . 84$4 14' 208 • 8• 208 . :7 . .4 208 3 . <br /> 13 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . .0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . Prem. . <br /> . . . . . . 2080 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 16 •208• •15 10• 208 A . .6 208 5 . <br /> . . . . . Prem. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . .STP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . .208 8.484 . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Piping Runs are estimated <br /> Date map was drawn:05/12/2020 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it,rather than this page, with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br /> spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br /> detectors; and in-tank liquid level probes (if used for leak detection). In the space provided,note the date this Site Plan <br /> was prepared. Page 1 of 1 05/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.