My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PART 1 FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
WORK PLANS_PART 1 FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 2:11:25 PM
Creation date
5/26/2020 1:12:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
PART 1 FILE 1
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
02
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a j <br /> e � <br /> t _ <br /> 45 <br /> Waterloo Systems comprised entirely of Contaminant investigation ata U.S.Airforce Detailed investigation of PCE delineation in <br /> stainless steel casing. packers and ports Base. Waterloo Systems installed to 700 ft. carbonate hedrock. A cost analysis of the <br /> with Teflon-lined tubing n•ere used to in overburden fusing screened and cased 14 1lirterloo S*vstenis compared with nested <br /> monitor contaminant flow in this bedrock wells. Up to6:ones per hole with dedicated pie:onreterc indicated sayings both on the <br /> application. pumps and t anducers. capital costs and on the,on-going monitoring. <br /> •i;.a �, <br /> Landfill site over fractured g>r•onite.numitor'ed withfive Kiiterloo 750ft.(230m)installationfi,ra deep funnel assessment study. Three <br /> Systems. Each System comprised(f dedic orad Double 1 irh'e Pumps :ones monitored with dedicated Double-1Wve Pumps mrd pressure <br /> and Pressure Transducers in 4-6 intervals to depths of 275 feet transducers. Picture shows teclrnic•ian obtaining pressure <br /> (84m). The nmltipurge manifold allowed the monitoring of 21 measurements andgrounchaner samples with portable teadoutand <br /> :ones to he completed in less than 2 den's, pump control unit. <br /> r' <br /> An in csti;ation oflarge ln•duulie•pruprties hcvuuth a lur;e nuto sc. A <br /> USArarch lr <br /> lect streh'inA <br /> agriculturalricultural <br /> Multilevel systenrs were chosen to allow water c/ualin•sampling; cffc•c•ts on waterquulity. 22 multilevel installations with 3-4:ones <br /> and to help determine the:ones of/ii-hest permeability within the each were installed to depths of?4-60 ft. (7.3-18.3 in) in <br /> uyrrifer: overburden. Dedicated Double 1 iah'e Pumps and Peristaltic Pumps <br /> were used. <br /> Primed in C:mada I'or f urther information, Please contact:Solinst Canada Ltd. • �, <br /> 9t97 :i Todd Road.Geor;,etown,ON.Canada L7G 4/tN E-antil:inst•unrcvrts(cisolin.tt.conrI 11"s <br /> 7T'l.:((Ai)87;-2 55 or (S00)66/-2023 FAX:+1(vo5)N73-1992 Web:lNtp:lltrtru'„roliusl.rour <br />
The URL can be used to link to this page
Your browser does not support the video tag.