The Contractor will furnish and install discharge piping for the <br /> pumping unit of sufficient size and length to conduct water to a <br /> point designated by the supervising geologist, together with <br /> acceptable orifices, meters, or other approved devices, which will <br /> accurately measure the flow rate. The length of discharge pipe <br /> required will not exceed 1001 . <br /> The initial pumping rate will be restricted. As the water clears, <br /> the pump rate will be gradually increased until the maximum rate is <br /> reached. The maximum rate will be determined by the supervising <br /> geologist after consideration of the well 's drawdown and discharge <br /> characteristics. At proper intervals the pump shall be stopped and <br /> the water in the pump column shall be allowed to surge back through <br /> the pump bowls and through the perforated area. <br /> The Contractor shall continue development until, in the opinion of <br /> the supervising geologist, the following conditions have been <br /> properly met: <br /> a. Sand production is less than 5. 0 parts per million within ten <br /> minutes after commencement of pumping at the maximum pumping <br /> rate. Sand production shall be measured by a centrifugal sand <br /> separating meter. <br /> b. There is no further increase in specific capacity during <br /> pumping and surging. The estimated drawdowns will be devel- <br /> oped from data collected during development. <br /> 2 - 7 <br />