SECTION 4 <br /> COMPLETION OF WELL CONSTRUCTION <br /> 4. 0 Final Cleanup <br /> After completion of all well tests, the Contractor will remove the <br /> test pumping equipment. The Contractor will then sound the well, <br /> and, if necessary, bail it clean of all loose material. The <br /> Contractor will then secure the well by tack-welding a steel plate <br /> on the top of the casing. <br /> The Contractor will restore all areas used for mud pits, percola- <br /> tion points, or other uses to their original conditions and levels. <br /> 4 . 1 Concrete Slab <br /> A three-foot by three-foot by two-foot above grade (3 ' x 3 ' x 21 ) <br /> concrete surface pad will be constructed at the well head. The pad <br /> will slope away from the well. See drawing presented in Appendix <br /> B showing completed well head arrangement for reference. <br /> 4 . 2 Disinfection <br /> After the well has been completely constructed, it shall be <br /> thoroughly cleaned of all foreign substances, including tools, <br /> timbers, rope, debris of any kind, cement, oil, grease, and scum. <br /> The casing pipe shall be thoroughly swabbed, using alkalis if <br /> necessary, to remove oil, or grease. The well shall then be <br /> disinfected with chlorine solution. <br /> The chlorine solution used for disinfecting the well shall be of <br /> such volume and strength and shall be so applied that a concentra- <br /> tion of at least 50 ppm of chlorine shall be obtained in all parts <br /> of the well. Chlorine solution shall be prepared and applied in <br /> accordance with the directions of, and to the satisfaction of the <br /> supervising geologist, and shall remain in the well for a period of <br /> at least two hours. <br /> In the event that the test pump is installed after the well has <br /> been disinfected, all exterior part of the test pump coming in <br /> contact with the water shall be dusted with a chlorine compound as <br /> directed by the supervising geologist. <br /> 4. 3 Well Performance Guarantees <br /> It is the general objective of these specifications to achieve <br /> sand-free and efficient wells. The Contractor will guarantee his <br /> work in terms of sand production of the well in accordance with the <br /> following: <br /> Sand production shall be less than five (5) parts per million (ppm) <br /> within 15 minutes at the maximum test capacity determined by the <br /> step drawdown test. Sand production shall be measured by a <br /> 4 - 1 <br />