Laserfiche WebLink
of Well No. <br /> BORING LOCATION DATE STARTED DATE FINISHED <br /> DRILLING CONTRACTOR MEASURING POINT ELEVATION AND DATUM <br /> DRILLING METHOD BORING TOTAL DEPTH I FINAL STATUS SCREEN INTERVAL <br /> DRILLING EQUIPMENT DEPTH TO FIRST COMPL. 24 HR. <br /> WATER ft. ft. ft. <br /> SAMPLING METHOD LOGGED BY <br /> SAMPLER TYPE RESPONSIBLE PROFESSIONAL REG. NO. <br /> 3 DESCRIPTION <br /> +J -4 -aa 4J F E r a <br /> 3 REMARKS <br /> a aai E*S 0 3 �a +4 ° <br /> Itl B Z c cL + --r NAME (USCS Symbol): color, moist, % by waigF�t, <br /> ❑ N N m J ° plast., =nsistsncy structure, camentaticn, ❑ <br /> react. w/HClcoo. inter. <br /> I <br /> Project No. I GEOMATRIX CONSULTANTS Figure , <br />