My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PART 1 FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
WORK PLANS_PART 1 FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 2:11:25 PM
Creation date
5/26/2020 1:12:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
PART 1 FILE 1
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
02
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROTOCOL <br /> INSTALLATION AND DESTRUCTION OF WELLS <br /> 1.0 INTRODUCTION <br /> This protocol describes the procedures to be followed during the installation or destruction of <br /> monitoring, groundwater extraction, and vapor extraction wells. Drilling and logging of soil <br /> borings for the well installation will be in conformance with the protocol DRILLING OF <br /> SOIL BORINGS.' The procedures presented herein are inte$ded to be of general use and may <br /> be supplemented by a work plan and/or health and safety plan. As the work progresses and if <br /> warranted, appropriate revisions may be made by the project manager. Detailed procedures in <br /> this protocol may be superseded by applicable regulatory requirements. <br /> 2.0 WELL INSTALLATION <br /> A DAILY FIELD RECORD will be completed for each day of fieldwork, and the original will <br /> be kept in the project files. If required, permits will be acquired from the appropriate <br /> agency(s), and an underground utility check will be performed before drilling begins. An <br /> underground utility check will, at a minimum, consist of contacting a local utility alert service, <br /> if available. <br /> After well installation, well completion report(s) will be completed and filed with the State <br /> Department of Water Resources or the appropriate agency. <br /> Each groundwater monitoring well will be designed to enable measurement of the potentio- <br /> metric surface and to permit water sampling of a specific water-bearing zone. Each vapor <br /> monitoring well will be designed to enable measurement of pressure conditions and permit <br /> sampling of a specific zone. The field geologist/engineer, in consultation with the project <br /> geologist or engineer, who will be licensed in the state in which the work is performed if <br /> required, will specify the screened interval using the lithologic log and geophysical log (if <br /> INSTALLATION AND DESTRUCTION OF WELLS Page I of 8 <br /> MSCIPROTO-IW.= REVISION DATE:MARCH 1996 IW-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.