My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PART 1 FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
WORK PLANS_PART 1 FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 2:11:25 PM
Creation date
5/26/2020 1:12:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
PART 1 FILE 1
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
02
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOMATROX <br /> Once the depth to the top of the filter material has been verified, bentonite or fine sand may be <br /> placed in the annular space as a transition seal between the filter material and the grout. A <br /> sufficient quantity of bentonite or fine sand will be poured to fill the annular space to a level of <br /> about 2 feet above the top of the filter pack. If bentonite is to be placed below standing water, <br /> a high-solids bentonite grout will be pumped through a tremie pipe, or pellets may be poured <br /> through the annulus. If bentonite is to be placed above standing water, a high-solids bentonite <br /> grout should be used or pellets may be placed in 6-inch lifts. Unless prohibited by well <br /> conditions, each lift should be hydrated using approximately 1 gallon of potable water per lift <br /> of pellets. The completed bentonite transition seal will be allowed to hydrate for at least 30 <br /> minutes prior to placing the grout. If a layer of fine sand is placed as the transition seal, the <br /> fine sand will be mixed with potable water and placed as a slurry through the tremie pipe or <br /> poured dry through the annulus. The depth to the top of the transition seal will be verified by <br /> measuring, using the tremie pipe or a weighted tape. <br /> A neat cement grout, cement/sand grout, cement/bentonite grout, or high-solids bentonite <br /> grout will be placed from the top of the transition seal to the ground surface. The grout seal <br /> will be placed by pumping through a tremie pipe lowered to within 5 feet of the top of the <br /> transition seal in mud rotary borings. The grout seal will be placed in hollow stem auger <br /> borings by free fall through the augers as they are incrementally raised or by pumping through <br /> flexible hose or tremie pipe lowered to near the bottom of the zone to be grouted. The grout <br /> must be tremied if there is standing water in the augers above the transition seal. <br /> Grout/additive/water mixtures will be determined on a site-specific basis. Typical <br /> specifications of grout mixtures include: (a) neat cement/bentonite grout, consisting of a <br /> mixture of one sack (94 pounds) of Portland Type I/II cement, approximately 2 to 5 percent by <br /> weight (of cement) powdered bentonite, and approximately 6 to 8 gallons of water; (b) neat <br /> cement grout, consisting of one sack of Portland cement and approximately 5 to 6 gallons of <br /> water; and (c) cement/sand grout, consisting of no more than two parts sand to one part <br /> cement and approximately 7 gallons of water. Only potable water will be used to prepare the <br /> grout. No work will be done on the monitoring well until after the grout has set <br /> approximately 24 hours. <br /> INSTALLATION AND DESTRUCTION OF WELLS Page 4 of S <br /> MSCIPROTO4W.TYT REVISION DATE:MARCH 1996 IW-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.