My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PART 1 FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
WORK PLANS_PART 1 FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 2:11:25 PM
Creation date
5/26/2020 1:12:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
PART 1 FILE 1
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
02
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GE®IiHA' RIX <br /> 2.6 DOCUMENTATION <br /> A well construction diagram for each well will be completed in the field on the WELL LOG <br /> by the field geologist/engineer and submitted to the reviewing geologist or engineer upon <br /> completion of each well. Well installation and construction data will be summarized on the <br /> DAILY FIELD RECORD or on a specialized form produced for this purpose. Well develop- <br /> ment notes and field measurements of water quality parameters will be summarized on a <br /> WELL SAMPLING AND/OR DEVELOPMENT RECORD. Following review by the project <br /> manager, the original records will be kept in the project file. <br /> 3.0 CLEANING OF DRILLING EQUIPMENT <br /> Cleaning of the drill rig and associated drilling equipment will follow the procedures discussed <br /> in Section 2.0 of the protocol DRILLING AND DESTRUCTION OF SOIL BORINGS. <br /> All well casing materials will be cleaned before they are installed. Well development <br /> equipment will be cleaned before use. The following cleaning procedure has been found to be <br /> effective and will be used or adapted as appropriate for general conditions of materials or <br /> equipment to be cleaned. <br /> 1. Steam-rinse with potable water or rinse in deionized or organic-free water. <br /> 2. Cover with clean plastic to protect materials and equipment from contact with <br /> chemical products, dust, or other contaminants. <br /> Alternatively, well casing materials that have been steam-cleaned and sealed in individual <br /> airtight plastic bags by the factory can be used. <br /> Decontamination rinsate will be collected and stored properly for future disposal by the client, <br /> unless other arrangements have been made. <br /> INSTALLATION AND DESTRUCTION OF WELLS Page 6 of 8 <br /> MSCIPROTO-IW.= REVISION DATE:MARCH 1996 IW-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.