My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PART 1 FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
WORK PLANS_PART 1 FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 2:11:25 PM
Creation date
5/26/2020 1:12:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
PART 1 FILE 1
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
02
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GE®MATRIX <br /> TABLE OF CONTENTS <br /> Page <br /> 1.0 INTRODUCTION............................................................................................................ 1 <br /> 2.0 BACKGROUND.............................................................................................................. 1 <br /> 3.0 GROUNDWATER OCCURRENCE IN EXISTING WELLS ........................................2 <br /> 3.1 GROUNDWATER ELEVATION AND DEPTH TO GROUNDWATER ...............................2 <br /> 3.2 GROUNDWATER GRADIENTS..................................................................................2 <br /> 4.0 NEW DMP WELLS .........................................................................................................3 <br /> 5.0 SCOPE OF WORK...........................................................................................................3 <br /> 5.1 MONITORING WELL DRILLING...............................................................................3 <br /> 5.2 MONITORING WELL INSTALLATION AND DEVELOPMENT......................................4 <br /> 5.3 SAMPLE COLLECTION AND ANALYSIS....................................................................4 <br /> 5.4 REPORTING............................................................................................................5 <br /> 6.0 SCHEDULE......................................................................................................................5 <br /> 7.0 REFERENCES .................................................................................................................6 <br /> FIGURES <br /> Figure 1 Location Map <br /> Figure 2 Site Plan and Location of Schematic Cross Sections <br /> Figure 3 Cross Section A-A' <br /> Figure 4 Cross Section B-B' <br /> Figure 5 Historical Groundwater Elevations (LP Wells) <br /> Figure 6 Historical Groundwater Elevations (PW Wells) <br /> Figure 7 Generalized Groundwater Gradient and Proposed DMP Locations <br /> Figure 8 Historical Vertical Groundwater Gradients <br /> APPENDIXES <br /> Appendix A Geomatrix Protocols <br /> Appendix B Geomatrix Health and Safety Plan <br /> Appendix C Simplot Contractor Safety Plan <br /> IAPROJEM6741.000\6741-06.doc 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.