My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PART 1 FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
WORK PLANS_PART 1 FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 2:11:25 PM
Creation date
5/26/2020 1:12:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
PART 1 FILE 1
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
02
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCC Lathrop Site <br /> Soil and Groundwater Samplin, ork Plan April 28, 2000 <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION..................................................................................................................1 <br /> 2.0 SITE PHYSICAL CHARACTERISTICS................................................................................1 <br /> 2.1 Site Location......................................................................................................................1 <br /> 2.2 Site Setting and Description ..............................................................................................1 <br /> 2.3 Geology.............................................................................................................................1 <br /> 2.4 Site Stratigraphy................................................................................................................2 <br /> 3.0 SCOPE OF WORK...............................................................................................................2 <br /> 3.1 Soil Sampling ....................................................................................................................2 <br /> 3.2 Waterloo Multilevel Groundwater Monitoring SystemsT"" 2 <br /> 3.3 Groundwater Sampling......................................................................................................3 <br /> 3.4 Field Documentation..........................................................................................................3 <br /> 3.5 Utility Location...................................................................................................................4 <br /> 3.6 Site Health and Safety.......................................................................................................4 <br /> 3.7 Investigation Derived Waste..............................................................................................4 <br /> 4.0 REPORTING........................................................................................................................4 <br /> LIST OF TABLES <br /> Table 1: Estimated Depth to Stratigraphic Layers <br /> Table 2: Analytical Methods for Soil Samples <br /> Table 3: Analytical Methods for Groundwater Samples <br /> LIST OF FIGURES <br /> Figure 1: Site Map Showing Location of Proposed Soil Boring and Center of <br /> Contaminant Plume <br /> Figure 2: Schematic Showing Details of Waterloo System Configuration <br /> LIST OF ATTACHMENTS <br /> Attachment A Waterloo System Product Information <br /> i <br /> The Source Group,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.