My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PART 2 FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
WORK PLANS_PART 2 FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 2:29:55 PM
Creation date
5/26/2020 1:27:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
PART 2 FILE 1
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
02
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCADIS SOP: Soil Drilling and Sample Collection 4 <br /> Rev.#: 2 1 Rev Date: March 8, 2011 <br /> • Ground Penetrating Radar(GPR) <br /> • Any other method that may give ample evidence of the presence or location of <br /> subgrade utilities. <br /> Overhead power lines also present risks and the following safe clearance must be <br /> maintained from them. <br /> Power Line Voltage Minimum Safe Clearance <br /> Phase to Phase(kV) (feet) <br /> 50 or below 10 <br /> Above 50 to 200 15 <br /> Above 200 to 350 20 <br /> Above 350 to 500 25 <br /> Above 500 to 750 35 <br /> Above 750 to 1,000 35 <br /> ANSI Standard 830.5-1994, 51-3.4.5 <br /> Avoid using drilling fluids or materials that could impact groundwater or soil quality, or <br /> could be incompatible with the subsurface conditions. <br /> Water used for drilling and sampling of soil or bedrock, decontamination of <br /> drilling/sampling equipment, or grouting boreholes upon completion will be of a quality <br /> acceptable for project objectives. Testing of water supply should be considered. <br /> Specifications of materials used for backfilling borehole will be obtained, reviewed and <br /> approved to meet project quality objectives. <br /> V. Health and Safety Considerations <br /> Field activities associated with overburden drilling and soil sampling will be performed <br /> in accordance with a site-specific HASP, a copy of which will be present on site during <br /> such activities. <br /> VI. Procedure <br /> Drilling Procedures <br /> The drilling contractor will be responsible for obtaining accurate and representative <br /> samples; informing the supervising geologist of changes in drilling pressure; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.