My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PART 2 FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
WORK PLANS_PART 2 FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 2:29:55 PM
Creation date
5/26/2020 1:27:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
PART 2 FILE 1
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
02
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCADIS SOP: Groundwater Sampling Using HydroPunchTM 5 <br /> Rev.#:011 Rev Date: March 3, 2009 <br /> • Retracting the sampler to ground surface—the drilling subcontractor will then open the <br /> sampler allowing collection of the groundwater sample[if using the HydroPunchTM I or <br /> else the HydroPunchTM II in groundwater mode(see Attachment A)] <br /> • Lowering a bailer or a peristaltic or inertia pump tube through the rods and body of the <br /> sampler, and retrieving the bailer or operating the pump to collect the groundwater <br /> sample[if using the HydroPunchTM II in hydrocarbon mode(see Attachment A)] <br /> 9. Perform field filtering of samples if required by the work plan, FSP and/or QAPP. <br /> 10. Obtain field water quality measurements if required by the work plan, FSP <br /> and/or QAPP. <br /> 11. Label the sample containers at the time of sampling with the following <br /> information. <br /> • Project name and number <br /> • Sample location <br /> • Sample number <br /> • Date and time of collection <br /> • Sampler initials <br /> • Analyses required <br /> 12. Preserve, store, handle, and ship samples to the analytical laboratory under <br /> chain of custody procedures as described in by the worts plan, FSP and/or <br /> QAPP. <br /> VII. Waste Management <br /> Investigation-derived waste will be managed as described in the Investigation-Derived <br /> Waste Handling and Storage SOP. <br /> VIII. Data Recording and Management <br /> Borehole identification, sample depth, sample date and time will be recorded in the <br /> field notebook, the boring log, and/or the personal digital assistant (PDA). The sample <br /> will also be identified on an appropriate chain of custody form, as appropriate for <br /> submittal to an analytical laboratory for analysis, if required. Consider digital <br /> photography to record unusual field conditions or to document compliance. <br /> gisop-libmryvelormatted sops 2008ftdrogeology sopsU98782-groundwater sampling using hydropunch.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.