Laserfiche WebLink
GEOMATRIX <br /> TABLE 1 <br /> WELL CONSTRUCTION DATA <br /> Lathrop Facility <br /> San Joaquin County, California <br /> Well Date Total Depth Dia. Slot Size Screen Interval Well Seal Elevation(ft MSL)6 <br /> Number' Completed (ft btoc)2 (in)3 (in)3 (ft bgs)4 (ft bgs)5 Top of Casing Northing? Eastin 7 <br /> LP-l 01/28/82 51.3 4.0 na 45-50 0-40 21.36 2116787.663 6337939.865 <br /> LP-2 01/25/82 65.3 4.0 na 59-64 0-54 18.58 2116971.220 6338465.428 <br /> LP-3 01/29/82 45.0 4.0 na 39-44 0-34 22.29 2116215.798 6338828.127 <br /> PW 1-48 03/27/82 48.0 6.0 na 40-45 0-36 25.82 2117857.035 6338772.871 <br /> LP-4 05/07/01 25.0 2.0 0.02 10-25 0-8 17.46 2116751.901 6337863.311 <br /> LP-5 05/07/01 25.0 2.0 0.02 10-25 0-8 17.38 2116970.678 6338490.960 <br /> LP-6 05/07/01 25.0 2.0 0.02 10-25 0-8 21.01 2116352.120 6338375.602 <br /> LP-7 05/08/01 25.0 2.0 0.02 10-25 0-8 20.75 2116246.983 6339008.837 <br /> 1. Well locations are shown on Figure 2. <br /> 2. Depth of well in feet below ground surface(bgs)or below top of casing(btoc). <br /> 3. Well casing diameter and slot size in inches. <br /> 4. Length of screened interval in feet bgs. <br /> 5. Depth interval of well seal in feet bgs. <br /> 6. Surveyed elevation of surface well completion and top of casing in feet above mean sea level(ft MSL). Survey was performed by Dillon&Murphy <br /> on March 20,2003. <br /> 7. Northings and Eastings of top of well casing surveyed by Fremming,Parson&Pecchenino on April 5,2005,and referenced to North American <br /> Datum of 1983. <br /> 8. Surveyed elevation of surface well completion and top of casing in feet above the North American Vertical Datum of 1988(NAVD88). Survey was <br /> performed by Thompson-Hysell Engineers. <br /> 1:\6000s\674I.000�wddN•c�67a 1-14.xls <br />