Laserfiche WebLink
i <br /> I CONSTRUCTION HB�UPRM T F'OR F-IN <br /> All connections to the NJDD collector eystem $hall take One of three <br /> alternative forms. Tho preferred method sh&II be direct mortaring <br /> of the tile outlet into an exieting�NJD6 manhole. <br /> a "3 S2[7�.$'CI7'[Y-O�'O'C7'•i.a o 4 J—bi � } <br /> -��/�r`t 4�--vs <br /> 1;a dPat.rSMn ---G-ept <br /> }h�.{I-1L <br /> � 'bT� a. <br /> 4 ". Asbestos-cement pipe may be used in this method, In all <br /> caaas, the followix�g requ�x ementy apply: <br /> 1 . Construction of the tie-in, and 7%i,r�tenz=e of the on-farm <br /> system, shall ensure exclu$i.on of suxfaoe water. <br /> 2. Water shall enter the NJDD system under gravity flow only. <br /> No direct pumping into the manhole or r:isior sh&12. be &UowPd, <br /> 3 . Location of the tie-j-n shall be appr''pved by the NJDD Board of <br /> Directors before construction begins. <br /> 4. Construction shall be inspected and approved by th¢ NJDD Board <br /> of Directors or their agents. <br /> i <br /> i <br /> i <br />