My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013333
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
750
>
2600 - Land Use Program
>
DP-91-58
>
SU0013333
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 1:31:35 PM
Creation date
5/26/2020 4:12:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013333
PE
2600
FACILITY_NAME
DP-91-58
STREET_NUMBER
750
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-
APN
19119003
ENTERED_DATE
5/21/2020 12:00:00 AM
SITE_LOCATION
750 W LOUISE AVE
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> JOEL LINKER <br /> DP-91-58 <br /> 1. DEPARTMENT OF PUBLIC WORKS <br /> Conditions of Approval: <br /> a. An Improvement Plan, prepared by. a Registered Civil Engineer, <br /> showing grading, drainage, driveway access details, on-site <br /> parking, and existing and proposed utility services shall be <br /> submitted to the Department of Public Works for approval. A <br /> $250. 00 Plan Check fee will be required at the time of <br /> submittal. <br /> b. An encroachment permit shall be required for work within the <br /> County road right-of-way. <br /> C. The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of the <br /> building permit application. (The fee currently is $771. 00 per <br /> 1, 000 gross square foot of building as "Manufacturing" in the <br /> Lathrop area. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record) . <br /> 2 . BUILDING DIVISION <br /> Conditions of Approval: <br /> a. Obtain permits for the tower and the equipment building. <br /> 3 . MANTECAILATHROP FIRE DISTRICT <br /> Conditions of Approval: <br /> a. The project shall conform with the Uniform Fire Code and <br /> Standards. <br /> b. The project shall conform with, if applicable, the National Fire⢠<br /> Protection Association Standards. <br /> C. The project shall conform with, if applicable, the City of <br /> Lathrop or San Joaquin County Fire Sprinkler Ordinance. <br /> d. The Fire Department Development Fee's shall be paid in <br /> accordance with the City of Lathrop, or San Joaquin County <br /> Ordinance and Resolution adopting the fee schedule. <br /> Industrial/Commercial at $ . 21 per square foot single family, <br />
The URL can be used to link to this page
Your browser does not support the video tag.