Laserfiche WebLink
SJVUAPCD- <br /> SJCZ <br /> Mitigation Measures <br /> page 2 <br /> 4 ) Streets adjacent to the project site should be swept as <br /> needed to remove silt which may have accumulated from <br /> construction activities. <br /> D.. At all times, ozone precursor emissions should be controlled <br /> by the following methods: <br /> 1) 1111 internal combustion engine driven equipment should be <br /> properly maintained and well tuned according to <br /> manufacturer' s specifications. <br /> 2) During the smog season (May through October) , .the <br /> construction period should be lengthened so as to minimize <br /> the number of vehicles and equipment operating at the same <br /> time. <br /> l <br />