Laserfiche WebLink
Christopher M. Palmer,PG,CEG, HG, Consulting Hydrogeologist <br /> 1345 Kimberly Drive San Jose,CA 95118 ph.4081267-5238;fax 4081267-7396 <br /> CMPRGCEGHG@aol.com <br /> January 10, 2012 _ j <br /> Project No. 188.02 /�, <br /> JAN 14 2Qf� 41 1 apt,r <br /> Mr. Paul Verma <br /> City of Tracy CIT'/QF <br /> 325 Civic Center Drive E.S <br /> Tracy, CA 95376 <br /> Re.: Monitoring Well Destruction Workplan forCft <br /> of Tracy Delta <br /> Disposal Site, 99 West 6th Street Tracy, CA <br /> Dear Mr.Verma, <br /> Christopher M. Palmer, Consulting HydrogeologfO' prepared this <br /> Monitoring Well Destruction Workplan for the Delta at 99 6`" Street, <br /> Tracy (Figure 1). This site received a "no further from the San <br /> Joaquin County Environmental Health Department O^Vust 2012. The <br /> EHD will issue a Case Closure Letter once the meWft awaftwing wells have <br /> been properly destroyed and all onsite waste mataft&hww�bftwn removed and <br /> properly disposed. <br /> This-workplan has,,.been prepared on behalf of So ! Zee <br /> cy (City) and <br /> contains .an outline of the proposed'. well method. Wright <br /> Environmental Services, Inc. boring logs, mom r aonstruction well <br /> details, and maps illustrating monitoring well locate we 41bod'hed. Once the <br /> EHD has reviewed and approved the workplan the CRy wS vsOct the contractor <br /> for the well destructionand submit well destruction . The City will <br /> directly contract the qualified C-57 well drilling acW, V " the work. <br /> The City is responsible for all well destruction drilGrg Vraso and proper <br /> disposal. - <br /> Please note that the EHD may amend the act'df - cedure that <br /> the well driller must follow per their approved R cations to well <br /> destruction procedures may occur in the f ld th ' destruction work. <br /> � y <br /> Monitoring Well Destruction A roach/ <br /> There are three monitoring w s at the D sposal site at t locations shown <br /> on Figure 2. The explora b ng 1o2,s a d monitoring weft construction details <br /> for each well are ais a to <br /> �+ Page 1 or 3 <br />