Laserfiche WebLink
ii <br /> Christopher M.Palmer, PG, CEG,HG, Consulting Hydrogeologist <br /> 1345 Kimberly Dtive San Jose,CA 95118 ph.4081267-5238;fax 4081267-7396 <br /> CMPRGCEGHG@aol.com <br /> January 10, 2012 <br /> Project No. 188.02 REQ <br /> JAN 14 20f� <br /> Mr. Paul Verma <br /> City of Tracy Cl f'/BFTF?a10�" <br /> 325 Civic Center Dries D.Q.S. <br /> Tracy, CA 95376 <br /> Re.: Monitotrn WO Destruction Workplan -for City of Tracy Delta <br /> Disposal West 6t"Street Tracy, CA <br /> Dear Mr.Vey, <br /> Christopher K P4w. Consulting Hydrogeologist (CMP) has prepared this <br /> Monitoring VkW 6000o0on Workplan for the Delta Disposal site at 99 6Street, <br /> Tracy (Figurtt t), Tft wite received a."no further action" letter from the San <br /> Joaquin Com C-AWRommental Health Department (EHD) in August 2012. The <br /> 'EHD will ismw, ot~ Closure Letter once the existing monitoring wells have <br /> been propes* .#nd all onsite waste materials have been removed and <br /> properly dish <br /> This workptao hU bow* prepared on behalf of the City of Tracy (City) and <br /> contains an the proposed well destruction method. Wright <br /> Environmer Inc. boring logs, monitoring well construction well <br /> details, and g.monitoring well locations are attached. Once the <br /> EHD has r i vipproved the workplan the City will select the contractor <br /> for the well submit well destruction permits to :EHD. The City will <br /> directly contnie &a quelfied C-57 well drilling contractor tb pQbV the work. <br /> The City is resports4ft lor all well destruction drilling was flr $_and proper <br /> disposal. Py, <br /> Please note tW may amend the actue e try ng,:� cedure that <br /> the well driller must 1011 per their approved V.I.. H, ifications to well <br /> destruction procedums may occur in the fi.Irl tll destruction work. <br /> Monitoring Well Oesbveition A proac� <br /> %[sat the D s oral site at the locations shown <br /> There are three mfgl� pon Figure 2. The explora n 1 Ioty�sapd monitoring well construction details <br /> for each well are als c � <br /> �+ Page 1 of 3 <br />