My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SONORA
>
110
>
3500 - Local Oversight Program
>
PR0545695
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 1:05:51 PM
Creation date
5/27/2020 12:20:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545695
PE
3528
FACILITY_ID
FA0003877
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #2
STREET_NUMBER
110
Direction
W
STREET_NAME
SONORA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13731025
CURRENT_STATUS
02
SITE_LOCATION
110 W SONORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC'IIEALTH� <br /> SER CES- <br /> SAN JOAQUIN COUNTY <br /> r' :z <br /> ENVIRONMENTAL HEALTH DIVISION .� <br /> Ernest M. Fujimoto, M.D., M.P.H., Acting Health Officer <br /> 304 E.Weber Ave., 3rd Floor • P. O. Box 388 r Stockton, CA 95201-0388 �q .. 1.:.•�P . <br /> 209/468-3420 <br /> JAMES GIOTTONINI C (OPY <br /> PUBLIC WORKS DIRECTOR <br /> CITY OF STOCKTON MAILED JUL 2 41995 <br /> 425 NORTH EL DORADO STREET <br /> STOCKTON CA 95202 <br /> RE: 110 WEST SONORA STREET SITE CODE: 1253 <br /> STOCKTON CA <br /> This letter is being sent to summarize the conclusions of the July 18, 1995 meeting at which the <br /> addendum to the Final Remedial Plan (FRP) for the above noted site was discussed and to provide a <br /> regulatory response to the addendum. <br /> At the July 18 meeting, it was mutually decided to initiate vapor extraction at the site as soon as <br /> feasible using the existing wells. Once the system is operating, additional wells may be added to the <br /> system as needed. <br /> The cost and efficiency of groundwater extraction technology was discussed and it was mutually <br /> agreed that groundwater extraction would not be implemented at the site unless new additional data <br /> suggests the need for this technology at this site. <br /> It was estimated that the design, permitting and construction process for the remediation.system would <br /> take approximately six months. <br /> I <br /> If you have any questions or wish to discuss this letter in more detail, please contact Linda Turkatte, <br /> Senior RENS, at (209) 468-3441. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Linda A. Turkatte, Senior REHS iane . Hinson, REHS <br /> Site Mitigation Unit V Supervisor <br /> LT <br /> C'. CVRWQCB, Beth Thayer <br /> c: Jim Escobar, COS Public Works <br /> c: Tom Lutterman, Smith Environmental <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.