Laserfiche WebLink
I <br /> James Giottonini <br /> Page 2 <br /> I <br /> * A workplan to assess the residual soil contamination remaining underneath the building will <br /> be submitted by October 15, 1993. Plans showing the construction of the building will be <br /> evaluated to determine the best method for the additional soil assessment. Three hand <br /> augered soil borings to approximately 10 feet below ground surface inside the prisoner bay <br /> area may be proposed if feasible. <br /> * The proposed field work should commence by November 15, 1993 and a report of findings <br /> should be submitted within thirty to sixty days after the completion of the field work. <br /> " The final disposition of the stockpiled soil inadvertently removed from theCity corporation <br /> yard is still under investigation. Final status of the soil will be discussed in the October 15, <br /> 1993 summary letter/workplan. <br /> Argonne and Picardy <br /> A <br /> * The City of Stockton is currently receiving bids for an over-excavation of the former tank pit <br /> area at this site. The bidding should be completed by October 7, 1993. <br /> * A workplan and a health and safety plan for the proposed over-excavation should be <br /> submitted by November 1, 1993. <br /> The next meeting is scheduled for February 7, 1994 at 1:30 p.m. and will be held at the PHS/EHD office. <br /> Should you have any questions or disagree with this summary of the September 20, 1993;meeting, please <br /> contact Mary Meays at (209) 468-0337 or Linda Turkatte at (209) 468-3441 of my staff. <br /> Jogi Khanna, M.D., M.P.H. <br /> Health Officer <br /> Donna Heran, REHS, Program Manager <br /> Environmental Health Division <br /> f <br /> DH/LT <br /> c: Elizabeth Thayer, CVRWOCB <br /> c: Jim Escobar, COS Public Works <br /> c: Stephen Chen, COS Public Works ' <br /> c: Sara Cortes, COS Public Works <br /> c: John Lane, RESNA Escalon j <br /> c: Richard Walls, RESNA Sacramento <br /> 1 <br />