Laserfiche WebLink
COS <br /> Page 2 <br /> Fontana Drive/Smith's Canal <br /> * Monitoring well, MW4, is very slow to recharge. Free product continues to be removed. <br /> * All the perimeter wells are non-detect at laboratory detection limits. The COS will request in <br /> September/October 1992, to have the sampling frequency of perimeter wells reduced. <br /> RESNA will evaluate the construction of perimeter wells and discuss the feasibility of <br /> hydropunching test holes or excavating shallow pits to define the plume of diesel contamination. <br /> * Once the plume is identified, remedial options will be investigated. The problem of pea gravel fill <br /> in relation to remedial options was discussed. <br /> The irrigation well will be destroyed by December 1992. <br /> 1501 Picardy <br /> * The summary report of the results of the re-excavation attempt will be submitted by October 1992. <br /> 110 West Sonora <br /> The due date for the final remedial plan/feasibility study was extended to January 1993. <br /> The next meeting was scheduled December 7, 1992 to be held at the PHS/EHD office. <br /> Should you disagree with the summary of the August 17, 1992 meeting, please contact <br /> Mary Meays at (209) 468-0337 or Linda Turkatte at (209) 468-0339 of my staff. <br /> Jogi Khanna, M.D., M.P.H. <br /> Health Office <br /> 2� <br /> urie A. Cotulla, REHS, Program Manager <br /> Environmental Health Division <br /> LAC/MM:Ib <br /> c: Elizabeth Thayer, CVRWQCB <br /> c: Jim Escobar, COS Public Works <br /> c: Stephen Chen, COS Public Works <br /> c: Sara Cortes, COS Public Works <br /> c: Glen Birdzell, COS Municipal Utilities <br /> c: Mark Madison, COS Municipal Utilities <br /> c: John Lane, RESNA Escalon <br /> c: Eloise Cherven, RESNA Sacramento <br />