Laserfiche WebLink
1 r, <br /> ATC Associates SITE SAFETY PLAN <br /> On-site communications: 0 Radio IM Verbal 0 Hand Signals <br /> 13 Other <br /> Designate hand signals here <br /> Off-site communications: 0 Radio ® Telephone <br /> 0 Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is To be determined on-site prior to beginning work activities <br /> MARK EVACUATION ROUTE(S) ON SITE MAP L7 CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure All contaminated personal _protective equipment <br /> (i e , gloves, coveralls) will be placed in 55-gallon <br /> drums and stored onsite with purge water <br /> Location of Wash Water: Restroom on-site <br /> Location of Toilet Restroom on-site <br /> Location of Drinking Water: ATC truck <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP O CHECK WHEN <br /> DONE <br /> Equipment Decontamination Procedure: Equipment will be washed with a tnsodium <br /> phosphate solution and/or steamcleaned <br /> Materials to be Disposed of as Hazardous Waste: All water produced during pilot test <br /> activities will be stored on-site in 55-gallon <br /> drums. <br /> PAGE 11 <br />