Laserfiche WebLink
• City of Stockton <br /> Page 2 <br /> 1740 Houston <br /> MW-9 and MW-10 were installed in February 2002 to define the extent of <br /> the MTBE groundwater plume as proposed in Work Plan Addendum <br /> dated November 19, 2001 prepared by AGE Analytical results of the <br /> grab groundwater samples collected between 50 to 60 feet below surface <br /> grade (bsg) from boring 138 and B9 were 210 µg/l and 48 µg11 of MTBE, <br /> respectively, but samples from below 60 feet bsg were either non-detect <br /> or not above primary or secondary maximum contaminant levels One <br /> quarterly monitoring event has been conducted EHD requests three <br /> consecutive quarterly sampling events <br /> 1465 S. Lincoln <br /> Report to be reviewed and discussed with Central Valley Regional Water <br /> Quality Control Board (CVRWQCB) <br /> As an update to the meeting discussion, EHD has submitted a request for <br /> concurrence on a "no further action required" determination from the <br /> CVRWQCB <br /> A meeting with the City of Stockton to discuss the status of their saes at that time <br /> is scheduled for 10 00 a m on July 11, 2002, at the offices of EHD <br /> If you have any comments or questions contact Margaret Lagono at (209) 468- <br /> 3449 or the EHD site manager <br /> Donna Heran, REHS, Director <br /> Environmental Health Department <br /> Margaret Lagono, Supervising REHS <br /> Site Mitigation Unit <br /> c 9VRWQCB - Marty Hartzell <br /> AGE - Bill Little <br /> ATC - Jeanne Homsey <br /> r <br />