Laserfiche WebLink
�VA � <br /> t—fir/�I7 <br /> Working to Restore Nature <br /> Vaipar Extraction Well onstruction <br /> Vapor extraction wells were constructed of thread jointed, 4-inch-diameter schedule PVC <br /> casing No chemical cements, glues, or solvents were used in well construction The <br /> screened portion of the wells consisted of factory-perforated casing with 0 020-inch-wide <br /> slots No. 3 sand was placed in the annular space opposite the screen to approximately 1 <br /> foot above the top of the slotted casing A 2-foot bentonite plug was placed above the sand <br /> pack, and a cement-bentonite slurry was used to fill the remaining annulus to the surface <br /> A traffic-rated cast-aluminum utility box with a PVC apron was placed over each wellhead <br /> and set in concrete flush with the surrounding concrete pad This box has a watertight seal <br /> to protect against surface water infiltration and is opened with a special wrench The design <br /> of the box discourages vandalism and reduces the possibility of accidental disturbance of the <br /> well. <br /> Monitoring Well Construction <br /> The monitoring well was constructed in the boring with thread-pointed, 2-inch-inner- <br /> diameter, Schedule 40 PVC casing No chemical cements, glues, or solvents were used in <br /> well construction The screened portion of the well consisted of factory-perforated casing <br /> with 0 020-inch-wide slots The well screen extends from the total depth of the well to <br /> approximately 5 to 10 feet above the groundwater surface This screened interval allows <br /> sampling at the air-water interface during seasonal fluctuations of the groundwater level <br /> The annular space in the well was packed with number 3 sand to approximately 1 to 2 feet <br /> above the slotted interval. A 3-foot thick bentonite plug was added above the sand pack to <br /> prevent the cement from entering the well pack The remaining annulus was backfilled to <br /> grade with a bentonite cement slurry <br /> The well was protected with a traffic-rated, cast-aluminum utility box equipped with a PVC <br /> skirt The box has a watertight seal to protect against surface-water infiltration and must <br /> be opened with a special wrench The design of this box discourages vandalism and reduces <br /> the possibility of accidental disturbance of the well <br /> Well Development <br /> We waited a minimum of 24 hours after well installation before developing the groundwater <br /> monitoring well to allow the grout to seal Before developing the monitoring well, a water <br /> sample was collected for subjective analysis from near the water surface in the well with a <br /> Teflon bailer cleaned with a laboratory-grade detergent and deionized water Floating <br /> product was not encountered The well was developed with a surge block and pump Well <br /> development continued until the discharge water was clear of silt and sand Clay-size <br /> sediments derived from the screened portion of the formation cannot be entirely eliminated <br /> by well development <br /> 11121ese/38009-4 <br />