Laserfiche WebLink
Work Plan-Soil and Groundwater Investigation <br /> CSUS—Multi-Campus Regional Center <br /> L lune 21,2000 <br /> Page-6- <br /> 5. PROJECT SCHEDULE <br /> LUpon approval of this work plan by the San Joaquin County PHS/EHD and notification_by CSUS to <br /> proceed, the field portion of the investigation can be completed within,approximately two to four weeks. <br /> - The tum-around time for laboratory analyses is approximately two weeks. A report can be submitted within <br /> two weeks of receipt of the laboratory analyses. If you need-additional information or have any questions, <br /> please call us at(209)234-0518. <br /> L <br /> r Respectfully submitted, <br /> �..i CONDOR EARTH.TECHNOLOGIES,INC. <br /> F. <br /> ���REu GEO�°c► �" <br /> Donald F. Kresse No.W0 - Ron Skaggs <br /> California Registered Division Manager <br /> Geologist#6430 <br /> 9�Of Cpl\��Q� <br /> L <br /> PA3024 CSUS-Multi-CamP us\Work Plan\S&GWinvWork Plan.doc <br /> tri - <br /> Lt� CONDOR <br />