Laserfiche WebLink
CONDOR EARTH GEOLOGICAL L O G <br /> *� TECHNOLOGIES, INC. <br /> PROJECT NO.: 3024 DATE: 12/11/01 TD; 61.0' <br /> 16- GP-7 SURF. COND.: Asphalt ELEV: ELEV. REF,: <br /> LOGGED BY: L. Morse WELL CONSTRUCTION SPECS <br /> PROJECT: CSUS Stockton Multi-Campus DRILL EQUIP.; Geo robe 6600 DP TOTAL CASING DEPTH: NIA <br /> FLUSH: N/A STICKUP: N/A <br /> CLIENT: CSUS Stockton HAMMER WT./FALL: N/A CASING DIA.: N/A TYPE: N/A <br /> LOCATION: Intersection,Flora&Aurora Streets HAMMER TYPE: N/A SLOT SZ.: N/A SAND SZ.: NIA <br /> SCREEN INT.: N/A <br /> `w DRILLER: Fisch Environmental GW DEPTH: N/A SAND INT.: N/A <br /> C-57 NO.: HOLE DIA.: 1.5" BENT. INT.: N/A <br /> GROUT INT.: NIA <br /> W u} K U <br /> 5Z j zC7 WELL <br /> CL LL 2 z o D O ¢ a U) SOIL DESCRIPTION REMARKS CONSTRUCTION <br /> ❑ U3 O � <br /> U DIAGRAM <br /> Asphalt <br /> r. <br /> LW 5 <br /> 10 <br /> SM SM: SILTY SAND;Moderate yellowish PID=2.4 ppm <br /> l5 brown,medium to coarse grained, dry <br /> LW <br /> 20 <br /> CL CL: CLAY;Moderate yellowish brown, moist PID=2.4 ppm <br /> Oi3�- <br /> 21 <br /> t. 25 CL CL: CLAY;Moderate yellowish brown,moist PID=0 ppm <br /> Iwr <br /> No sample recovered <br /> 3a <br /> L" NOTES: PID=Photoionization detector DP =Direct Push ppm= Parts per million <br /> GP-7 backfilled with neat cement <br /> �. PG. 1 of 2 <br />