Laserfiche WebLink
P SCSA-University Park <br /> Site Background <br /> Page 4 <br /> On August 10, 2004, a Condor representative was on site to conduct the third quarter 2004 quarterly <br /> groundwater monitoring event. Field observations indicated that no separate phase petroleum, sheen or <br /> odor was noted in the groundwater recovered from the wells. The average depth to groundwater in the <br /> monitor wells was 41.40 feet below the surveyed well collar measuring points (the measuring points are <br /> slightly below the ground surface). The average groundwater elevation measured in the monitoring wells <br /> decreased 2.50 feet between March 13, 2003, and August 10, 2004. The estimated groundwater gradient <br /> for the site on August 10, 2004, was 0.0023 ft/ft to the south. The groundwater gradient direction (south) <br /> is the southern-most gradient direction estimated for the site during the brief monitoring history. Historic <br /> gradient directions have ranged from approximately due east to approximately due south. The site water <br /> table elevation decreased relatively steadily from approximately 20 feet below mean sea level to <br /> t approximately 24 feet below mean sea level during the site monitoring history (December 2001 to August <br /> 2004). The`laboratory analytical results of the groundwater samples collected from'MW-1, MW-2, and <br /> MW-3 on August 10, 2004,were generally consistent with the historic laboratory analytical results. <br /> On November 10, 2004, a Condor representative was on site to conduct the fourth quarter 2004 quarterly <br /> groundwater monitoring event. Field observations indicated that no separate phase petroleum or sheen <br /> was found in any of the monitoring wells. Moderate to strong odor was noted in groundwater recovered <br /> from MW-2 and MW-3. The average depth to groundwater in the monitor wells was 42.76 feet below the <br /> surveyed well collar measuring points (the measuring points are slightly below the ground surface). The <br /> average groundwater elevation measured in the monitoring wells decreased 1.36 feet between August 10, <br /> 2004 and November 10, 2004. The estimated groundwater gradient for the site on August 10, 2004, was <br /> 0.0018 ft/ft to the southeast. Historic gradient directions have ranged from approximately due east to <br /> approximately due south. The site water table elevation decreased relatively steadily from approximately <br /> _ 20 feet below mean sea level to approximately 25 feet below mean sea level during the site monitoring <br /> history (December 2001 to November, 2004). The laboratory analytical results of the groundwater <br /> samples collected from MW-1, MW-2, and MW-3 on November 10 and 11, 2004 were generally <br /> i <br /> consistent with the historic laboratory analytical results. <br /> As the plan for site development was modified and clarified during 2003, very aggressive and timely but <br /> less cost-effective site remediation (over-excavation, as proposed in the above described March 3, 2003 <br /> work plan) was no longer considered necessary by the SCSA. Condor, on behalf of the SCSA, proposed <br /> evaluation of site source area remediation by pilot testing of air-sparging in combination with soil vapor <br /> extraction in a work plan dated September 15, 2004. In a letter dated November 8, 2004, Mr. Henderson <br /> of the SJCEHD expressed concern with two aspects of the proposed approach and requested submittal of <br /> a work plan addendum by January 17, 2005, addressing his concerns. Concurrently, site development <br /> plans continued to evolve such that a structure planned for the site vicinity was to be located well away <br /> from the site contaminant source area and that a parking lot for the structure would be built over the site <br /> source area. These considerations indicated the potential for consideration of less aggressive site <br /> remediation techniques. <br /> As a result of the above considerations a meeting was held on December 17, 2004, with all concerned <br /> parties in attendance. As a result of the meeting it was agreed that Condor would prepare a work plan for <br /> ' additional groundwater investigation and feasibility evaluation of various remediation options for the site. <br /> In an email transmission on January 6, 2005, to Mr. Henderson at the SJCEHD, Condor requested an <br /> extension of the work plan submittal due date back to February 4, 2005. Mr. Henderson approved the <br /> extension in a return email on-January 6, 2005. The above-mentioned work plan was then submitted on <br /> February 7, 2005. Approval of the work plan by the SJCEHD is pending. <br /> - a <br /> t <br /> r <br />